A bottling company expanding to a second production facility needed its technology ready before the plant opened. Employees would depend on business systems at headquarters, while the production floor needed connectivity for equipment monitoring and vendor support. Unified Technology Solutions (UTS) became involved before the building purchase and coordinated the rollout through installation and testing. The work connected the new plant to the existing business and established the IT environment UTS would continue supporting after opening.
The Challenge
The new facility had to function as part of an established business from its first day. Business applications and shared files would remain at headquarters, so employees needed a reliable way to reach them across the two locations. The plant also needed its own phone system, with options for reaching the original office while that office retained its separate telephone system. On the production floor, specialized bottling equipment required wired and Wi-Fi connectivity for remote monitoring and technical support. Mechanics needed Wi-Fi for video conversations with equipment vendors during maintenance and troubleshooting. Those office and production needs had to be addressed together while internet service, structured cabling, network equipment, PCs and phones were arranged around the opening schedule.
The Approach
Planning the rollout before the building purchase
UTS began planning with company leadership before the client purchased the building, establishing how employees would access headquarters-hosted resources and how connectivity would support the production equipment. That put the IT requirements into the facility plans early enough to coordinate the services and equipment needed for opening. UTS worked with the internet service and structured wiring providers while arranging equipment purchasing, configuration and deployment. The internet connection and cabling formed the foundation for the plant's network, workstations and communications systems, so coordinating those providers was part of getting the facility ready alongside installing and configuring the equipment itself.
Connecting business systems and calls across locations
The team installed the plant's network and Wi-Fi, configured its PCs, and established a site-to-site VPN and Remote Desktop access. Employees could use the business applications and shared files hosted at headquarters without relocating those resources to the new plant. For communications, UTS installed a VoIP phone system at the facility and configured call menus and transfer options for reaching headquarters and mobile phones. The original office kept its separate phone system. Together, those arrangements let staff work with the business systems already in place and direct calls across the organization without requiring a replacement headquarters phone system as part of the plant opening.
Supporting production connectivity and vendor access
On the production floor, wired and wireless connectivity supported remote monitoring and management of bottling equipment. Wi-Fi also let mechanics hold video discussions with equipment vendors while working through maintenance or troubleshooting. UTS provided the IT connectivity and assisted with interfaces between the IT environment and production machinery; the equipment vendors and mechanics remained responsible for the machinery itself. This gave the people maintaining the equipment a way to consult vendors from the plant while keeping responsibility for IT support and equipment maintenance clear.
Testing the systems before opening
Before the facility opened, UTS completed a full system walkthrough and testing with the client's representatives. The client confirmed that the systems were operational during that review. Installation and testing were completed ahead of opening, with the IT infrastructure in place when the plant began work.
The Results
The plant opened with employees able to reach headquarters-hosted business resources, use the new phone system to route calls across the business, and access the connectivity needed for production-equipment support. UTS continued providing all network and PC support for the new facility, along with support for its phone system and VPN connectivity. The team also continued assisting with interfaces between the IT environment and production machinery and provided remote support to headquarters. That ongoing involvement carried the project from early planning and deployment into daily operations, with the equipment vendors and mechanics continuing to handle the machinery itself.
